This group assignment predominantly relates to industrialised building systems (IBS), building maintenance, and tall buildings. Before embarking on this project, students will be exposed to different types and methods of the IBS system, the calculation of IBS scoring, the type of maintenance, and the concept of tall buildings in the classroom.
Figure 1: Examples of the apartment unit arrangement.
The report should be written in an A3 (landscape) size report. The report MUST INCLUDE the following.
| No. | Activity | Date |
| 1. | Project Briefing | Week 1 |
| 2. | Interim Assessment | Week 10 |
| 3. | Presentation and Submission | Week 14 |
| NO. | MARKING CRITERIA | MARKS | POOR | SATISFACTORY | GOOD | EXCELLENT |
|---|---|---|---|---|---|---|
| 1. | Precedent study (preferably an apartment building constructed using IBS) | 10 | The precedent study is not related to the IBS system chosen and contains no information on it.
(max. 2.5) |
The precedent study is 50% related to the IBS system chosen and contains little information on it.
(max. 5) |
The precedent study is 70% related to the IBS system chosen and contains partial information on it.
(max. 7.5) |
The precedent study is 100% related to the IBS system chosen and contains complete information on it.
(max. 10) |
| 2. | Design Authenticity, creativity, and workability of the design |
10 | Lacks creativity and poorly workable design.
(max. 2.5) |
Moderately designed with a moderate level of creativity and acceptably workable.
(max. 5) |
Well-produced and highly creative design with good workability.
(max. 7.5) |
Excellently produced and highly creative design with excellent workability. (max. 10) |
| 3. | IBS Components Appropriateness and the number of IBS components used. Proper Method of Installation on the Building Components |
30 | Between 20% – 40% of the components are IBS or mostly inappropriate translations of IBS methods used.
(max. 7.5) |
Between 41% – 60% of the components are IBS or overall moderately appropriate translations of IBS methods used.
(max. 15) |
Between 61% – 80% of the components are IBS or overall highly appropriate translations of IBS methods used.
(max. 22.5) |
More than 80% of the components are IBS or overall excellently appropriate translations of IBS methods used.
(max. 30) |
| 4. | IBS Score Calculation | 20 | The IBS score has been miscalculated, resulting in an illogical value.
(max. 5) |
The IBS score has been calculated correctly with a below 70 score.
(max. 10) |
The IBS score has been calculated correctly with a 70 – 80 score.
(max. 15) |
The IBS score has been calculated correctly with a 90 – 100 score.
(max. 20) |
| 5. | Building Maintenance Strategic Plan proposal | 30 | Poorly produced Building Maintenance Strategic Plan proposal for the IBS building.
(max. 7.5) |
Moderately produced Building Maintenance Strategic Plan proposal for the IBS building.
(max. 15) |
Well-produced Building Maintenance Strategic Plan proposal for the IBS building.
(max. 22.5) |
Excellently produced Building Maintenance Strategic Plan proposal for the IBS building.
(max. 30) |
| TOTAL | 100 |
Completing the CMA534 IBS Building Project can be challenging due to complex IBS component selection, IBS score calculations, and long-term maintenance planning. Many students struggle to translate IBS concepts into a workable 7-storey apartment design with proper justification. At Malaysia Assignment Help, our construction experts provide AI-free, human-written reports aligned with Malaysian construction standards. Get reliable guidance from IBS Construction Assignment Help Malaysia specialists and submit with confidence. Explore trusted academic support through instant assignment help malaysia today.