CMA534 Sustainable and Large-Scale Construction Assessment Semester Oct 2025 – Feb 2026
Assignment Type
Individual Assignment
Subject
CMA534 Sustainable and Large-Scale Construction
Uploaded by Malaysia Assignment Help
Date
12/15/2025
CMA534 Group Project – IBS Building Project.
| Assessment | Type | Mark | Submission |
| Coursework | Group Project | 40% | Week 14 23/01/26 |
Introduction
This group assignment predominantly relates to industrialised building systems (IBS), building maintenance, and tall buildings. Before embarking on this project, students will be exposed to different types and methods of the IBS system, the calculation of IBS scoring, the type of maintenance, and the concept of tall buildings in the classroom.
Struggling with your CMA534 IBS Building Group Project?
Objectives of Project
- To develop students’ understanding of different types of IBS construction methods and types of building maintenance.
- To demonstrate a comprehensive understanding of the IBS construction process and building maintenance.
- To foster good communication skills among group members through proper work delegation and deliverables production.
Learning Outcomes of this Assignment
- Identify and collect relevant research data for a precedent study.
- Relate basic structural elements and structural principles in construction.
- Enable students to assess and understand the methods of calculating the IBS Score
Tasks – Methodology
- Students are required to form a group of 4 members. Anything less or more shall be subject to the lecturer’s approval.
- The group will need to study a building (preferably an apartment) constructed fully or partially using the IBS method and identify all the IBS components used, including appropriate sizes, etc.
- Each group must design a simple 7-storey apartment block using IBS components, with a maximum size of 92.9 square meters per unit (1000 square feet). Each unit must include a living hall, a dining area, three bedrooms and two toilets.
- The design should mainly incorporate appropriate sizes of IBS structures (shear wall or frame structure) and components, such as precast walls, blockwork, hollow core slabs, precast staircases, toilet pods, prefabricated timber roof trusses, etc. The units shall be arranged in clusters and made into seven levels (refer to Figure 1).
- Calculate the IBS Score for the proposed system in detail (You may make any appropriate assumptions).
- Prepare the outline of the Building Maintenance Strategic Plan proposal for a long-term period to sustain the apartment building. Provide information on the maintenance organisation, policy, and strategy approach for maintenance management. This includes types of maintenance implementation, scope of work, and any relevant information regarding maintenance.
Figure 1: Examples of the apartment unit arrangement.
Submission Requirement
The report should be written in an A3 (landscape) size report. The report MUST INCLUDE the following.
- Introduction: Precedent study (related to the proposed IBS system) 2. Content:
- Apartment design (Plans and Elevations). ii. Proposed IBS categories (rationale of choosing the proposed system) iii. IBS Score
- Schedule of modular components
- Method of Installation Building Components vi. Building Maintenance Strategic Plan proposal vii. Others: Any relevant information about IBS and building maintenance that might be interesting.
- Conclusion
Project Schedule
| No. | Activity | Date |
| 1. | Project Briefing | Week 1 |
| 2. | Interim Assessment | Week 10 |
| 3. | Presentation and Submission | Week 14 |
Marking Rubric
| NO. | MARKING CRITERIA | MARKS | POOR | SATISFACTORY | GOOD | EXCELLENT |
| 1. | Precedent study (preferably an apartment building constructed using IBS) | 10 |
The precedent study is not related to the IBS system chosen and contains no information on it. (max. 2.5) |
The precedent study is 50% related to the IBS system chosen and contains little information on it. (max. 5) |
The precedent study is 70% related to the IBS system chosen and contains partial information on it. (max. 7.5) |
The precedent study is 100% related to the IBS system chosen and contains complete information on it. (max. 10) |
| 2. |
Design Authenticity, creativity, and workability of the design |
10 |
Lacks creativity and poorly workable design. (max. 2.5) |
Moderately designed with a moderate level of creativity and acceptably workable. (max. 5) |
Well-produced and highly creative design with good workability. (max. 7.5) |
Excellently produced and highly creative design with excellent workability. (max. 10) |
| 3. |
IBS Components Appropriateness and the number of IBS components used. Proper Method of Installation on the Building Components |
30 |
Between 20% – 40% of the components are IBS or mostly inappropriate translations. (max. 7.5) |
Between 41% – 60% of the components are IBS or moderately appropriate translations. (max. 15) |
Between 61% – 80% of the components are IBS or highly appropriate translations. (max. 22.5) |
More than 80% of the components are IBS or excellently appropriate translations. (max. 30) |
| 4. | IBS Score Calculation | 20 |
The IBS score has been miscalculated, resulting in an illogical value. (max. 5) |
The IBS score has been calculated correctly with a below 70 score. (max. 10) |
The IBS score has been calculated correctly with a 70 – 80 score. (max. 15) |
The IBS score has been calculated correctly with a 90 – 100 score. (max. 20) |
| 5. | Building Maintenance Strategic Plan proposal | 30 |
Poorly produced Building Maintenance Strategic Plan proposal for the IBS building. (max. 7.5) |
Moderately produced Building Maintenance Strategic Plan proposal. (max. 15) |
Well-produced Building Maintenance Strategic Plan proposal. (max. 22.5) |
Excellently produced Building Maintenance Strategic Plan proposal. (max. 30) |
| TOTAL | 100 |
Suggested References
- Chew, Y.L. (2012). Construction Technology for Tall Buildings, (4th Edition). World Scientific, Singapore
- Michael Chew Yit Lin, Construction Technology For Tall Buildings, 5th Edition, World Scientific Publishing Co Pte Ltd, 2017, ISBN: 9789813220683
- Chudley,Roger Greeno,Mike Hurst,Simon Topliss, Advanced Construction Technology, 5th Edition, Heinemann Educational Publishers, 2015, ISBN: 9780435046835
- Anna Magrini, Building Refurbishment for Energy Performance, Springer, 2016, ISBN: 9783319375489
- Roy Chudley , Roger Greeno, Building Construction Handbook, 11th Edition, Taylor & Francis Ltd, 2016, ISBN: 9781138907096
Need help Complete Your CMA234 Assignment?
Get Help By Expert
Completing the CMA534 IBS Building Project can be challenging due to complex IBS component selection, IBS score calculations, and long-term maintenance planning. Many students struggle to translate IBS concepts into a workable 7-storey apartment design with proper justification. At Malaysia Assignment Help, our construction experts provide AI-free, human-written reports aligned with Malaysian construction standards. Get reliable guidance from IBS Construction Assignment Help Malaysia specialists and submit with confidence. Explore trusted academic support through instant assignment help malaysia today.