This Assignment is designed to assess CO4 [PO5]; students expected to prepare the assignment as described below.
CO4: Demonstrate the project planning and schedule control using project
management software. [PO5, LO2, SS1] {P5}
PO5 Able to Create, select and apply appropriate techniques, resources, and
modern engineering and IT tools, including prediction and modelling, to
complex engineering problems, with an understanding of the limitations
(WK6)
WP WP1 – Depth of knowledge required
WP4 – Familiarity of issues (involved infrequently encountered issues)
WP7 – Interdependence (are high level problems including many
component parts or sub-problems)
To develop a comprehensive project management plan for an engineering project worth at least $500,000, using Microsoft Project software. Students will assume the role of the Project Manager and will be responsible for planning the project from initiation to closing.
The submitted assignment should cover all contents as highlighted in Table 1 –
Assignment 2 Assessment Rubric.
(This rubric will be used as a guide to mark the students’ work)
(v) (PO5) Modern Tool Usage – Create, select and apply appropriate techniques, resources, and modern engineering and IT tools, including prediction and modelling, to complex engineering problems, with an understanding of the limitations (WK6); [Reference: Engineering Programme Accreditation Standard 2020, 6.2 Criterion 2 Programme Outcomes, page 9, Engineering Accreditation Council (EAC), Board of Engineers Malaysia (BEM)]
(WK6): Knowledge of engineering practice (technology) in the practice areas in the engineering discipline. [Reference: IEA Graduate Attributes and Professional Competency Profiles, International Engineering Alliance IEA, Version 3, 21 June 2013, http://www.ieagreements.org.]
Scale | 1 | 2 | 3 | 4 | 5 |
---|---|---|---|---|---|
Criteria | Poor | Acceptable | Excellent | Factor | |
1. Summary of the Project to relate with the Engineering Practice (requirement of Microsoft Project Software/ as a modern tool): at least 10 Main subproject/ activities and together with estimated resources (to be tabulated in a Table and presented in report and to be planned in the Project Management Software) (20) |
Poor Summary of engineering project |
Fair Summary of engineering project |
Excellent Summary of engineering project with 10 Sub-projects (to reflect on complex engineering problems and include all detailed activities): -Together with the main Milestone, sub activities and estimated overall resources, cost and budget for the project. – Complete Network Diagram, resources & budget in Microsoft Project file to reflect on the use, and complex overt response of the |
4 | |
Page 3 of 5 students’ in using the software. |
|||||
2 Estimation of Resources, budget & Costing by using appropriate techniques to relate with the engineering practice in tackling the selected project, including: Man- Machine- Material- Method- Money using Work, Resource and Cost Breakdown Structure, Decomposition, Bottom Up Estimation Approach, and other approaches (presented in the report and software) (20) |
Poor presentation of knowledge of engineering practices to cover Estimation of Resources, budget and costing |
Fair presentation of knowledge of engineering practices to cover Estimation of Resources, budget and costing |
Clear and excellent presentation of knowledge of engineering practices to cover estimation of Resources, budget and project costing: -include Man- Machine-Material- Method-Money; -using Breakdown Structure, Decomposition, Bottom Up Estimation and other approaches; -cover overall resources and costing in report and in Microsoft project file |
4 | |
3. Construction of Project Planning and costing, and Schedule Control using appropriate techniques in Microsoft Project Software (to include activity, and resources using Project Management Software) (50) |
Poor construction of Project Planning and Schedule Control using Project Management Software |
Moderate construction of Project Planning and Schedule Control using Project Management Software |
Excellent construction (create, select and apply appropriate techniques) for Project Planning and Schedule Control using Project Management Software -proper project planning for stated duration (with Start & End date) -highlight proper planning of event/ / activities -Construct |
10 | |
Page 4 of 5 activities together with Start-End of activities, Milestones, resources required for activities and overall cost (as in Item (1) & (2)), and to reflect overall progress (based on specific instruction) using the Microsoft Project Software |
|||||
4 Measurement and Estimation of Risk with appropriate technique which might effect the project implementation (report) (10)- including references |
poor estimation of Risk and overall report |
Moderate estimation of Risk & overall report |
Excellent estimation of Risk using appropriate techniques & to relate the overall resources and Microsoft Project Software (in a report), and to include all range of project management risks in Project Planning, Execution stage, Control and Monitoring, and closing. |
2 | |
Assessment Value | 100% |