MGT5024 Assessment 2 Sample: TNB Industry and Competitive Analysis Report (Sunway)

For information and reference only – not to be submitted as your own work.

This MGT5024 Assessment 2 sample shows how an abridged industry and competitive analysis could look when the chosen company is Tenaga Nasional Berhad (TNB), the same company used in our Assessment 1 model. It follows the tasks in the Sunway MGT5024 Assessment 2 brief: two industry tools, two company tools, a competitive strength assessment and a revised strategy. If you still need the earlier part, see the MGT5024 Assessment 1 PESTLE report sample and the matching guide on how to write an MGT5024 PESTLE strategic analysis report. For the method behind this sample, read our guide to writing the MGT5024 Assessment 2 report.

Company facts below come from the cited sources. All scores and weights in the competitive strength table are illustrative judgements created for this sample, and your own scores must be justified with your own evidence.

Planning table

Brief part Suggested words What markers look for
2A Industry analysis (two tools) 600–650 Tools applied to the industry, linked to Assessment 1 factors, with judgement on attractiveness
2B Company analysis (two tools) 450–500 Evidence-based view of resources and activities, not a list of strengths
2B Competitive strength assessment 250–300 Clear factors, weights, scores and a reasoned conclusion against named rivals
2C Revised strategy 400–450 Recommendations that trace back to specific findings

Confirm the word limit, tolerance and formatting in your own brief before you plan.

Part 2A: Industry competitive analysis

Tool 1: Porter’s Five Forces

Porter (2008) argues that industry profitability depends on five forces: rivalry, new entrants, substitutes, buyer power and supplier power. For Malaysia’s electricity supply industry in Peninsular Malaysia, the forces are shown below.

Force Strength Evidence and reasoning
Rivalry among existing firms Low to moderate Independent power producers such as Malakoff sell electricity to TNB under long-term agreements, so they compete for contracts more than for customers. Prai Power, a Malakoff subsidiary, signed a four-year extension of its agreement with TNB running to 31 March 2030 (The Star, 2026).
Threat of new entrants Low but rising Grid and licensing barriers are high, but the Corporate Renewable Energy Supply Scheme introduced third-party access to the grid in Peninsular Malaysia from 20 September 2024 (Skrine, 2024).
Threat of substitutes Moderate Rooftop solar and corporate green power can replace part of grid demand, although most users still need the grid for reliability.
Buyer power Low for households, moderate for large corporates Household tariffs are regulated. Large companies now have a route to buy renewable electricity directly from producers through the scheme.
Supplier power Moderate Fuel, equipment and independent generators have bargaining power, but regulated agreements limit how far prices can move.

Overall, the industry is moderately attractive: regulation protects returns, but the new access rules weaken the old monopoly-style position of the incumbent. This builds on the regulatory and sustainability factors prioritised in Assessment 1.

Tool 2: Industry key success factors

Key success factors are the conditions that decide who wins in an industry. For electricity supply, the evidence points to three. The first is grid reliability, because customers and regulators judge a utility by outages. The second is access to capital, because TNB says it spent about RM12 billion in 2025 on supply security, demand growth and energy transition projects (TNB, 2026b). The third is low-carbon capability, because national decarbonisation goals and corporate buyers both push in that direction. These factors become the criteria in the competitive strength assessment below.

Need help choosing the right two industry tools for your company? Our management desk can review your plan.

Part 2B: Company competitive analysis

Tool 3: VRIO framework

Barney (1991) proposes that a resource gives lasting advantage when it is valuable, rare, difficult to imitate and supported by the organisation. Applied to TNB:

Resource Valuable Rare Costly to imitate Organised to exploit Implication
Nationwide grid and customer base Yes Yes Yes Yes Sustained advantage
Reliability record Yes Yes Partly Yes Temporary to sustained advantage
Large-scale access to capital Yes Partly Partly Yes Competitive parity to temporary advantage
Renewable development capability Yes No No Developing Competitive parity

TNB reported a system minutes figure of 0.15 and an average interruption duration of 46.93 minutes for 2025, down from 47.88 (TNB, 2026a). This supports the reliability judgement. The renewable row is weaker because other developers can build solar and similar projects.

Tool 4: Value chain analysis

Porter’s value chain separates primary activities from support activities (Porter, 1985). For TNB, the primary activities of generation, transmission, distribution and customer service all feed one outcome: reliable supply. The support activity that matters most is technology and infrastructure, because management describes its direction as “Reimagining Tenaga 2.0”, built on clean generation, an energy transition network, dynamic energy solutions and regulatory evolution (TNB, 2026c). The value chain shows that the distribution and grid stages create the most defensible value, while generation is the stage where independent producers compete.

Competitive strength assessment (illustrative)

The assessment scores TNB against two named rivals, Malakoff and YTL Power International, on the key success factors identified above. Weights add up to 1.00 and scores run from 1 (weak) to 10 (strong). These numbers are illustrative.

Factor Weight TNB score TNB weighted Malakoff score Malakoff weighted YTL Power score YTL Power weighted
Grid and network reach 0.20 9 1.80 3 0.60 4 0.80
Financial strength 0.15 8 1.20 6 0.90 7 1.05
Reliability record 0.20 8 1.60 7 1.40 7 1.40
Low-carbon capability 0.20 6 1.20 6 1.20 7 1.40
Customer relationships 0.15 9 1.35 2 0.30 5 0.75
Cost flexibility 0.10 5 0.50 6 0.60 6 0.60
Total 1.00 7.65 5.00 6.00

On these illustrative scores, TNB leads overall because of grid reach and customer relationships, while it is level with or behind rivals on low-carbon capability and cost flexibility. The result shows where TNB’s position is strong and where it is exposed.

Part 2C: Revised strategy

Assessment 1 classed TNB’s strategy as differentiation within a regulated cost base. The new findings suggest keeping that choice but changing how it is applied.

  1. Protect the reliability lead. The Five Forces and VRIO results show that reliability is both a key success factor and a rare resource. Continue to invest in grid digitalisation so the average interruption duration keeps falling.
  2. Become the preferred partner for third-party renewable supply. Third-party access lowers the entry barrier and cuts into the monopoly advantage. TNB can respond by offering grid services and joint projects to renewable developers instead of treating them only as rivals.
  3. Close the low-carbon gap. The strength assessment shows TNB at parity on low-carbon capability. Target partnerships and acquisitions where its capital advantage helps most.
  4. Improve cost flexibility. The lowest TNB score is on cost flexibility, so set cost-to-serve targets that fit within the regulated framework.

Risks include regulatory change, project delays and the chance that corporate buyers move faster than the grid can adapt. Each recommendation should have a measure, such as interruption minutes, share of renewable capacity or cost to serve, so progress can be tracked.

Send your MGT5024 brief through our submit page if you want tailored support with your own company.

References

Barney, J. (1991). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99–120. https://doi.org/10.1177/014920639101700108

Porter, M. E. (1985). Competitive advantage: Creating and sustaining superior performance. Free Press.

Porter, M. E. (2008). The five competitive forces that shape strategy. Harvard Business Review, 86(1), 78–93. https://hbr.org/2008/01/the-five-competitive-forces-that-shape-strategy

Skrine. (2024, September 25). CRESS guidelines: Regulatory framework and requirements for Malaysia’s third party access to electricity grid. https://www.skrine.com/insights/alerts/september-2024/cress-guidelines-regulatory-framework-and-requirem

Tenaga Nasional Berhad. (2026a, May 21). TNB advances energy transition agenda while delivering long-term value to the nation [Press release]. https://www.tnb.com.my/assets/press_releases/20260521_11_bi.pdf

Tenaga Nasional Berhad. (2026b, February 26). FY2025 results [Press release]. https://www.tnb.com.my/assets/press_releases/20260226_03_eng.pdf

Tenaga Nasional Berhad. (2026c). AGM presentation 2026: Appendix B. https://www.tnb.com.my/assets/energy_watch/AGM_Presentation_2026_Appendix_B.pdf

The Star. (2026, March 9). Malakoff executes four-year extension for Prai Power Plant operations. https://www.thestar.com.my/business/business-news/2026/03/09/malakoff-executes-four-year-extension-for-prai-power-plant-operations

Malaysia Assignment Help Editorial Team

Prepared by

Malaysia Assignment Help Editorial Team

This model answer was prepared by our editorial team in response to a real assignment brief we received. It shows one way to approach the task and is meant as a study guide, not for submission.

Private and Confidential

Yours all information is private and confidential; it is not shared with any other party. So, no one will know that you have taken help for your Academic paper from us.

Online Exam & Assignment Writing Services
Malaysia Assignment Order Image

165,254+ Orders Delivered

Malaysia Assignment Order Star Rating

4.9/5
5 Star Rating

Confidential & Secure

Group Assignment Help

Online Exam -Test & Quiz

Cheapest Price Quote

Diploma & Certificate Levels

Semester & FYP Papers

Summative & Individual

GBA & Reflective

Last Minute Assistance

Ask Your Homework Today!

We have over 1000 academic writers ready and waiting to help you achieve academic success

Sample Assignment Download

MGT648 Research Methodology Assignment UITM Example
This course will introduce you to a process for solving financial problems that has been designed by experts in the field. The method involves identifying your issue, gathering information about…
Management
DSC551 Programming For Data Science UITM Assignment Example Malaysia
The data science course is designed for those who have an interest in the field of analytics and want to learn more about how it works. You'll be able to…
Computer & It

UP TO 15 % DISCOUNT

Instant Paper Writing Services by Native Malaysia Writers

Plagiarism Free Solutions
100% Original Work
24*7 Online Assistance
Native PhD Experts
Hire a Writer Now

Facing Issues with Assignments? Talk to Our Experts Now!Download Our App Now!

Have Questions About Our Services?
Download Our App!

Get the App Today!

Download app QR code

Get Assistance for Assignments, online Exam, and Projects Writing